Laying out and gluing parts
Painting the back board
Holes drilled in 8"x 8"x 8"Junction box
All fittings and pipes glued
Mounted the board to the greenhouse frame with self drilling sheet metal screws.
Plumbing the board, pulling wires through the conduit
Intermatic / Grasslin GM40 timer wired
No comments:
Post a Comment