Thursday, November 7, 2013

Control Board Finishing

Laying out and gluing parts

Painting the back board

Holes drilled in 8"x 8"x 8"Junction box

All fittings and pipes glued


Mounted the board to the greenhouse frame with self drilling sheet metal screws.

Plumbing the board, pulling wires through the conduit

Intermatic / Grasslin GM40 timer wired 


No comments:

Post a Comment