Electrician came and installed the electric service panel and grounds.
Ground
4g Wire
Four copper pipes burst when we neglected to drain the system one night.
A blessing In disguise, it turns out that the company that made made the heating panel forgot to solder a joint (shown by the pipe with bare copper)
Fixed
No comments:
Post a Comment